Close Menu
  • Home
  • AI
  • Big Data
  • Cloud Computing
  • iOS Development
  • IoT
  • IT/ Cybersecurity
  • Tech
    • Nanotechnology
    • Green Technology
    • Apple
    • Software Development
    • Software Engineering

Subscribe to Updates

Get the latest technology news from Bigteetechhub about IT, Cybersecurity and Big Data.

    What's Hot

    Enabling agents to learn from experience

    April 24, 2026

    The invisible engineering behind Lambda’s network

    April 24, 2026

    Tim Cook to become Apple Executive Chairman John Ternus to become Apple CEO

    April 24, 2026
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    Big Tee Tech Hub
    • Home
    • AI
    • Big Data
    • Cloud Computing
    • iOS Development
    • IoT
    • IT/ Cybersecurity
    • Tech
      • Nanotechnology
      • Green Technology
      • Apple
      • Software Development
      • Software Engineering
    Big Tee Tech Hub
    Home»Green Technology»Ontario could reduce local power grid upgrade costs by up to 11% using ‘non-wires’ solutions like batteries and two-way EV chargers: study
    Green Technology

    Ontario could reduce local power grid upgrade costs by up to 11% using ‘non-wires’ solutions like batteries and two-way EV chargers: study

    big tee tech hubBy big tee tech hubApril 24, 2026003 Mins Read
    Share Facebook Twitter Pinterest Copy Link LinkedIn Tumblr Email Telegram WhatsApp
    Follow Us
    Google News Flipboard
    Ontario could reduce local power grid upgrade costs by up to 11% using ‘non-wires’ solutions like batteries and two-way EV chargers: study
    Share
    Facebook Twitter LinkedIn Pinterest Email Copy Link


    TORONTO — As Ontario’s electricity demand is projected to grow significantly over the next two decades, non-wires solutions—a term that encompasses energy storage, demand response to alleviate peak loads, energy efficiency, and decentralized power generation—are emerging as a prudent way to defer and avoid costly grid upgrades. 

    New analysis commissioned by Clean Energy Canada and conducted by The Brattle Group finds that distributors and system operators can achieve significant cost-savings when distributed energy resources (DERs) are leveraged to mitigate distribution system constraints. If this type of targeted DER deployment and control can be scaled across the province, it could reduce distribution capital expenditures by 5% to 11% over the next 20 years. 

    DERs are technologies that can generate and store energy or control load: devices like controllable water heaters, battery storage, managed two-way EV charging, smart thermostats, and solar PV, all of which the Brattle study incorporated into its model. Critically, Brattle found that the cost of deploying more DERs—including offering incentives to consumers—would be less than the total benefit they would provide in terms of avoided generation, transmission, and distribution costs.

    To its credit, the Ontario government, as well as the Independent Electricity System Operator and local distribution companies, already centre energy efficiency and demand management in their planning, such as through the province-wide Peak Perks program that rewards customers for allowing the grid operator to manage their smart thermostat during peak events. But this study outlines that there is even more DER potential on top of what is currently recognized—and a need to move faster.

    Brattle’s analysis fills a gap with real-world data from the Essex Powerlines system in Southwestern Ontario, illustrating that portfolios of DERs can be orchestrated to manage local distribution system load and cost-effectively defer infrastructure upgrades in many different scenarios, with deferral periods ranging from 3.5 to 8 years. 

    Finding ways to account for and compensate these contributions will be essential to unlocking and incentivizing more use-cases for DERs. Achieving these results also depends on acquiring the capability to manage DERs either through distributed energy resource management solutions or aggregator participation. 

    Overall, as the province’s electricity demand continues to grow while utilities look for ways to lower costs, deploying DERs as non-wires solutions presents a compelling alternative to the traditional investment model. Not only can this approach create significant savings for the system—and help to keep bills in check for customers—but DERs can also provide benefits like improved home comfort, lower emissions, and better resilience for communities and households.





    Source link

    Batteries Chargers Costs grid local nonwires Ontario power reduce Solutions Study twoway upgrade
    Follow on Google News Follow on Flipboard
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email Copy Link
    tonirufai
    big tee tech hub
    • Website

    Related Posts

    How JPMorgan navigates energy policy

    April 23, 2026

    Ursa Ag In Alberta Wants To Sell Farmers Tractors With A Diesel Engine

    April 22, 2026

    Britain’s empty buildings could unlock billions, advocacy group tells treasury

    April 22, 2026
    Add A Comment
    Leave A Reply Cancel Reply

    Editors Picks

    Enabling agents to learn from experience

    April 24, 2026

    The invisible engineering behind Lambda’s network

    April 24, 2026

    Tim Cook to become Apple Executive Chairman John Ternus to become Apple CEO

    April 24, 2026

    Analyst View: The Rise of AndTek – Why Google and MediaTek are the New WinTel

    April 24, 2026
    Timer Code
    15 Second Timer for Articles
    20
    About Us
    About Us

    Welcome To big tee tech hub. Big tee tech hub is a Professional seo tools Platform. Here we will provide you only interesting content, which you will like very much. We’re dedicated to providing you the best of seo tools, with a focus on dependability and tools. We’re working to turn our passion for seo tools into a booming online website. We hope you enjoy our seo tools as much as we enjoy offering them to you.

    Don't Miss!

    Enabling agents to learn from experience

    April 24, 2026

    The invisible engineering behind Lambda’s network

    April 24, 2026

    Subscribe to Updates

    Get the latest technology news from Bigteetechhub about IT, Cybersecurity and Big Data.

      • About Us
      • Contact Us
      • Disclaimer
      • Privacy Policy
      • Terms and Conditions
      © 2026 bigteetechhub.All Right Reserved

      Type above and press Enter to search. Press Esc to cancel.