Close Menu
  • Home
  • AI
  • Big Data
  • Cloud Computing
  • iOS Development
  • IoT
  • IT/ Cybersecurity
  • Tech
    • Nanotechnology
    • Green Technology
    • Apple
    • Software Development
    • Software Engineering

Subscribe to Updates

Get the latest technology news from Bigteetechhub about IT, Cybersecurity and Big Data.

    What's Hot

    TypeScript 6.0 beta lays the foundation for shifting the codebase from JavaScript to Go

    February 15, 2026

    Is IFS therapy evidence-based — or is it a sham? Does it matter?

    February 15, 2026

    Japan restarts nuclear power generation

    February 15, 2026
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    Big Tee Tech Hub
    • Home
    • AI
    • Big Data
    • Cloud Computing
    • iOS Development
    • IoT
    • IT/ Cybersecurity
    • Tech
      • Nanotechnology
      • Green Technology
      • Apple
      • Software Development
      • Software Engineering
    Big Tee Tech Hub
    Home»Green Technology»Japan restarts nuclear power generation
    Green Technology

    Japan restarts nuclear power generation

    big tee tech hubBy big tee tech hubFebruary 15, 2026012 Mins Read
    Share Facebook Twitter Pinterest Copy Link LinkedIn Tumblr Email Telegram WhatsApp
    Follow Us
    Google News Flipboard
    Japan restarts nuclear power generation
    Share
    Facebook Twitter LinkedIn Pinterest Email Copy Link



    Register BanneryH5BAEKAAEALAAAAAABAAEAAAICTAEAOw==
    Japan restarts nuclear power generation
    The Kashiwazaki-Kariwa plant in Nigata Prefecture (image credit: Tepco)

    Japan’s Kashiwazaki-Kariwa Nuclear Power Plant was restarted on 9 February, the first reactivation of a nuclear power facility in the country since the 2011 accident at Fukushima. It is scheduled to begin commercial generation again in mid-March.

    Located in Japan’s Nigata Prefecture, the plant is considered the world’s largest by installed capacity (approximately 7,965 MW),1 and is operated by Tokyo Electric Power (Tepco), the operator of the former Fukushima Daiichi Nuclear Power Plant.

    The 1,356-megawatt (MW) unit 6 reactor was restarted at 2pm local time on 9 February, and is scheduled to resume power generation and transmission on 16 February. A planned shutdown is to be undertaken on 20 February, prior to further inspection by the NRA. Commercial operation is expected to begin on 18 March.

    Unit 6 and 7 at the plant are both advanced boiling water reactors (ABWR), the first such deployment of the technology in the world. This is an evolution of the older-style BWR reactors used at Fukushima, and those present elsewhere at Kashiwazaki-Kariwa, which are not expected to be restarted. ABWRs feature additional safety systems including redundant core cooling systems and a more modern containment vessel said to be capable of withstanding severe earthquakes and tsunamis.

    Tepco has commented: “We will continue to conduct integrity checks of the plant equipment under actual steam operating conditions, while fully and sincerely responding to inspections by the Nuclear Regulation Authority.”

    Approval to restart the unit 6 and 7 reactors at the plant was secured from the NRA in 2017, but awaited local approval, which was finally granted late last year by Nigata Prefecture.

    Sanae Takaichi became Japan’s first female Prime Minister in October 2025, with a mandate to greatly expand the role of nuclear in the country’s energy mix, and professed policy priorities of securing energy security, economic stability and stable electricity supply.

    Prior to Fukushima, nuclear power provided around 30% of the country’s electricity, but was stopped entirely within 14 months of the 2011 accident. This followed a 9.0 earthquake in the region, which in turn triggered a tsunami.

    Notes
    [1] The “largest plant” title is also potentially attributable to Bruce Nuclear Generating Station in Ontario, which is a leader in annual electricity generation.

    yH5BAEKAAEALAAAAAABAAEAAAICTAEAOw==



    Source link

    Generation Japan nuclear power restarts
    Follow on Google News Follow on Flipboard
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email Copy Link
    tonirufai
    big tee tech hub
    • Website

    Related Posts

    From Turing to Today: What Years of AI Progress Teach Modern AI Tech Consulting

    February 15, 2026

    2026 B.C. budget needs to protect rebates and incentives that lower energy bills

    February 14, 2026

    Shein drops ‘net zero’ language in Germany after activist complaint

    February 13, 2026
    Add A Comment
    Leave A Reply Cancel Reply

    Editors Picks

    TypeScript 6.0 beta lays the foundation for shifting the codebase from JavaScript to Go

    February 15, 2026

    Is IFS therapy evidence-based — or is it a sham? Does it matter?

    February 15, 2026

    Japan restarts nuclear power generation

    February 15, 2026

    How to Use the REXX LISTDSI Function to Get z/OS Dataset Information Quickly and Easily

    February 15, 2026
    About Us
    About Us

    Welcome To big tee tech hub. Big tee tech hub is a Professional seo tools Platform. Here we will provide you only interesting content, which you will like very much. We’re dedicated to providing you the best of seo tools, with a focus on dependability and tools. We’re working to turn our passion for seo tools into a booming online website. We hope you enjoy our seo tools as much as we enjoy offering them to you.

    Don't Miss!

    TypeScript 6.0 beta lays the foundation for shifting the codebase from JavaScript to Go

    February 15, 2026

    Is IFS therapy evidence-based — or is it a sham? Does it matter?

    February 15, 2026

    Subscribe to Updates

    Get the latest technology news from Bigteetechhub about IT, Cybersecurity and Big Data.

      • About Us
      • Contact Us
      • Disclaimer
      • Privacy Policy
      • Terms and Conditions
      © 2026 bigteetechhub.All Right Reserved

      Type above and press Enter to search. Press Esc to cancel.